Developed Projects

Hydraulic study

 of Los Padrotes sector, San Fernando, Apure river

DESCRIPTION

Hydraulic evaluation of the Los Padrotes sector, with the purpose of projecting the works of stabilization of the margins and consolidation of the navigation channel, in harmony with the Environment, and to protect the sector against floods.

Location

Apure State, Venezuela. 2007

Technical Project Leader

Eng. Roberto Savelli

SCOPE
  • Survey of basic information.
  • Hydrological, geomorphological, geological, sedimentological and hydraulic analysis.
  • Development of one- and two-dimensional hydrodynamic and sediment transport models.
  • Simulation of work alternatives. Detailed engineering of the proposed works.
  • Cost-benefit evaluation of solutions.
  • Environmental evaluation.

Other Projects

Development of Navigation in the Orinoco - Apure Axis
Hydraulic works for the adequacy of the María Nieves Bridge. Apure River
Reconstruction of western breakwater, San Carlos Island. Maracaibo Lake
Dredging project of INVECEM Pier, Cumarebo. 1.169.111 m3
Maintenance dredging project, El Palito Refinery. 915.517 m3
Pedernales Field Dredging Project - 556,320 m3
Dredging inspection of the navigation channel of the Orinoco river. Orinoco river. 9.200.000 m3.
Dredging of Petro San Felix auxiliary dock. Jose Industrial Complex. 79,469 m3